STEP ONE - ROOF ASSESSMENT

The first step is to have a professional contractor assess the condition of your roof. We will inspect the roof, physically or with a drone, to determine if it needs to be replaced and identify any potential issues that may need to be addressed immediately. We are looking for: s

  • Shingle loose, worn or missing shingles

  • Wind damage to soffit or facia

  • Signs of water intrusion, such as wood warping

STEP two - Detailed Estimate

After the assessment, we will go over our findings and recommendations. We will provide you with an estimate of the cost of the replacement, the colors and materials you’d like, and finalize our contract.

This may include an EAGLEVIEW detailed report with satellite imaging, detailed roof dimensions, and structural layout. This is report will give us a detailed report of your roof, allowing us to give an a accurate quote.

EagleView premium roof report dated November 14, 2024, for a property at 219 Big Sky Dr, Minneola, FL 34715. The report includes details about roof pitch, area, roof percentage, structure complexity, waste calculation, totals for lengths, areas, and pitches, property location coordinates, and notes indicating the roof was ordered as residential with no structural changes in recent years.
Diagram of a property showing length measurements of different segments. The diagram includes labels for ridges, valleys, rakes, eyes, flashing, step flashing, and parapets, with specific lengths in feet. A compass rose indicating directions is present.

SHORT ON CASH? NO PROBLEM!

we offer options for 100% financing, Get a new roof for $0 MONEY DOWN!

Learn more
Building permit document with a yellow safety helmet and a rolled-up blueprint on top.

STEP three - SCHEDULING & permits

Once you’ve signed the contract, we will need to schedule the roofing project on a time and date that works for you. Our team will order materials for your project which should arrive before the build date. We will also go over our project checklist to keep your property safe and clear.

We will also make sure to begin the permitting process with the city, to ensure compliance with structural building codes and requirements.

STEP Four - Build Day

The morning of the build day, or the day prior, we will have materials delivered on site. Before beginning the project we will set up tarps and dumpster for trash and debris collection.

After this, we will begin the process of removing your old roof and installing the new one. This is our chance to assess the decking. We will assess the quality of the surface and notify you if there will be any additional charges.

Workers installing new roofing on a house, with wooden planks and roofing materials scattered across the roof.
Aerial view of a house roof under maintenance with roofing materials and tools. The house has a partially replaced roof section, and neighboring houses are visible.

STEP FIVE - Quality Assurance

During the roofing process, the City may send an inspection to ensure that the roof is being completed in compliance with building codes. Some Inspectors require the work to haled half way, in order to assess the quality.

After the work is complete, we will perform a final inspection to ensure that the roof is properly installed. We will also do a final clean up to make sure we leave your property better than it was before.

main reasons for insurance claim denial:

Homeowner attempts to deal with the insurance company alone, without using technical reports, or knowledge of the process.